Mobilfunk-Basisstation nutzt Windenergie (Allgemein)

charles ⌂ @, Samstag, 11.10.2008, 11:34 (vor 5874 Tagen) @ helmut

Hallo Helmut,

die Küste ist hier weit weg.

Engländer habern dies errechnet.

***********************************
A crucial issue for turbine profitability is the so-called load factor – the proportion of power generated compared with the theoretical maximum. According to government statistics, the average load factor for turbines in 2006 was 27.4%, meaning a typical 2MW turbine actually produced only 0.54MW on average.

The subsidy system means, however, that turbines can make a profit even when they are operating at very low load factors.

The worst performing turbine in Britain is said to have a load factor of just 7%, meaning it produces a fourteenth of the power it was designed for. Two former senior Ofgem executives have cast doubt on claims by energy companies that the recent 15% increase in household bills is due to the higher cost of wholesale gas and electricity.

***********************************
Ich kan dies bestätigen.
Wir haben hier 6 Windturbinesn von Vestas.

Mehrere davon stehen manchmal still.
Die Wartung ist enorm.
Fast jedentag muss einer oder sogar zwei davon gewartet werden.
Oder haben einfach Störungen.

Ich kann das vom Fenster beobachten.

Die Betreiber sindohne Skruples.
Man wollte ein neuer auf 69 Meter Distanz von unsere Wohnung bauen.
Die Fahnen kamen dann auf 15 Meter von eine 2600 Liter Propangastank.

Wir haben uns beschwert, und recht bekommen.

Komisch dabei ist auch, das der Strom dieser 6 Turbinen gerade vom Trafostation aufgenommen werden kann. Mehr kann er nicht transportieren.

--
Charles Claessens
www.milieuziektes.nl


gesamter Thread:

 RSS-Feed dieser Diskussion

powered by my little forum